Phase 2 Mapletree-SUTD Design Partnership.
Two versions, one made from reclaimed wood planks and designed for a public space, the other made from Onewood Mass Engineered Timber (by Pacific Forest Pte Ltd) with an experimental design to challenge the structure and reduce material consumption.